Queensland Curtis LNG (QCLNG) will be the world's first project to turn gas from coal seams into liquefied natural gas, or LNG. The project, which has been under construction since 2010, will provide cleaner hydrocarbon energy for export markets from 2014. 

The three (LNG) projects sit side-by-side, with the first plant scheduled for completion in 2014.

In September 2012, Concrete Canvas was specified as the surfacing material for 60m high cuttings surrounding the sites. A total of 15,730sqm (in both CC5 and CC8) was installed on red soil in order to protect the slope against the effects of wind and long term environmental damage.

CC was specified over conventional lining solutions such as shotcrete or reinforced concrete due to the cost and time savings offered as well as additional site specific benefits.

 